Power Projects Approved: GB & Gwadar to Benefit | Pakistan News

Pakistan Prioritizes Energy Security & Advancement: Gwadar, Gilgit-baltistan⁣ Receive Major Investment Boost

Islamabad, ​December 9th, 2025 ​ – In a decisive move to bolster‌ national economic growth⁢ and regional‍ development, ‌Prime Minister Shehbaz Sharif has spearheaded ⁤a series of ‌initiatives focused on strengthening Pakistan’s power infrastructure and accelerating key⁤ development projects. Recent directives emphasize a commitment to reliable, affordable energy access, especially in strategically vital regions like‌ Gwadar and Gilgit-Baltistan (GB), alongside a broader push for transparent and efficient project execution nationwide.

Addressing Gwadar’s Power Needs: A⁤ Extensive Plan for Enduring Growth

Recognizing the critical ​role of uninterrupted power supply in unlocking Gwadar’s potential as a‌ major economic hub, the Prime Minister has approved the immediate implementation of a comprehensive plan to ‌resolve existing issues impacting the port city. This commitment stems from a ⁢clear understanding ⁤that a robust‍ energy infrastructure is fundamental to attracting investment​ and ⁤fostering economic activity.

“Uninterrupted electricity supply⁤ in Gwadar will certainly enhance national economic activity and investment,” stated the⁤ Prime minister, emphasizing ‌the need for electricity‍ standards that meet both regional and international benchmarks for industries and investors.

The plan, outlined during a high-level meeting, includes both short-term and long-term solutions.Minister for Energy Sardar Awais Ahmad Khan Leghari reported a 42% reduction in power supply disruptions in Gwadar thanks to⁢ recent ministry actions. ​ Further stabilization of voltage levels is targeted within the next six months.‌ Specific projects include:

* Short-Term (8-12 months): Installation of 9.7 megawatts⁤ of solar⁣ capacity across major government institutions.
* Long-Term: A 40-megawatt project‍ designed to ensure a ⁢sustainable power supply for Gwadar’s growing⁣ needs.

These initiatives are crucial given projected electricity demand increases of 30% in the ⁤coming years, driven by ongoing ⁢industrial expansion, ⁤port⁤ development, and urban growth. This ⁣proactive approach demonstrates a‍ commitment to future-proofing Gwadar’s energy infrastructure.

Gilgit-Baltistan to Benefit from 100MW‌ Solar Initiative: ⁤A leap Towards Clean Energy & Regional Prosperity

Simultaneously, the Prime Minister has prioritized ⁢the energy needs of Gilgit-Baltistan, ⁣directing the immediate initiation of a 100-megawatt solar project. This ambitious undertaking is designed to provide uninterrupted,sustainable,and environmentally pleasant electricity to the region.

the project is structured around two key components:

* 18-Megawatt Rooftop Solar ⁤Program: Leveraging existing infrastructure for distributed generation.
* 82-Megawatt Utility-Scale Solar Project: A large-scale installation to significantly increase overall capacity.

Expected to be completed by 2027, the project​ represents a significant investment in GB’s economic development.Joint efforts between the GB government and the Ministry of Energy are projected to generate annual savings of Rs1 billion ​for the government. The GB government has pledged ⁣to ​ensure timely provision of land,communications,infrastructure,and other⁢ necessary facilities to facilitate the project’s prosperous implementation.

“The welfare and economic​ development of the people of Gilgit-Baltistan⁤ is among the top priorities of the federal​ government,” the Prime Minister affirmed, ⁢highlighting the government’s dedication to promoting industrial activity, investment, and economic‌ growth in the region.

Nationwide Development: A Focus on Transparency and Efficiency

Beyond specific regional projects, Prime Minister Shehbaz underscored the government’s unwavering commitment to the transparent and timely completion of‌ nationally significant development projects. He announced the formation of a‍ steering committee, ​personally chaired, comprising federal and provincial ‌stakeholders, to oversee a comprehensive‌ reform strategy ‍covering all stages of⁤ project development – from approval and planning to procurement and human​ resource deployment.

This initiative signals a strong‌ intent to address systemic challenges that have historically hampered project execution. The ​Prime​ Minister expressed gratitude for⁢ the support and technical assistance provided by international development partners, ​including the World Bank and the Asian ‍Development Bank⁣ (ADB), in driving these crucial reforms.

Attracting Investment in Pakistan’s Healthcare Sector

In a separate meeting, the Prime Minister engaged with a delegation of Pakistani-origin ⁤doctors residing in the US, lead by Dr. Samir Shafi.⁢ He directed the Ministry of Economic Affairs⁢ to develop a comprehensive roadmap⁤ for investment in ‌Pakistan’s healthcare sector, in direct consultation with the physicians. The focus is on⁤ resolving ⁣obstacles to investment and⁣ facilitating the ⁢contributions of Pakistani doctors living abroad. ‍

Looking Ahead: A Vision​ for sustainable growth

These initiatives collectively demonstrate a proactive and strategic approach ​to addressing Pakistan’s‍ energy ‍and development ​challenges.‌ By ⁤prioritizing‌ infrastructure investment, fostering regional economic growth, and promoting transparency ⁣and ⁤efficiency, the government is laying the foundation for a more ​prosperous and sustainable ‍future. The commitment to‍ clean⁣ energy solutions, like

Leave a Comment