The proposed construction of the new Lisbon airport, officially designated as the Luís de Camões Airport, is projected to cost between 7,9 and 8,9 mil milhões de euros. This estimate, which reflects the scale of the infrastructure project intended to alleviate capacity constraints at the current Humberto Delgado Airport, was recently detailed as part of the ongoing planning process for the new site in the Alcochete region.
According to reports from national media outlets, including the Diário de Notícias, the financial requirements for the project have been mapped out as the government and airport operator ANA (Aeroportos de Portugal) advance with the technical specifications. The development is designed to be a significant expansion of Portugal’s aviation infrastructure, with the goal of creating a hub capable of handling long-term passenger growth.
Infrastructure Specifications and Design
The Luís de Camões Airport project aims to establish a high-capacity facility located across the Tagus River from Lisbon. Recent disclosures from the airport operator, ANA, have provided the public with visual representations of the planned terminal and runway configurations. These renderings, which have been widely circulated by outlets such as Euronews, illustrate a modern architectural approach intended to integrate with the surrounding landscape of the Campo de Tiro de Alcochete.
The project is not merely an expansion of existing facilities but a new, greenfield development. The selection of the Alcochete site follows years of deliberation regarding the optimal location for a secondary or replacement hub for the Portuguese capital.
Economic Impact and Project Timeline
According to the Observador, the project remains under active review as authorities refine the budget and operational requirements for the coming decade.

Strategic Importance for Portugal
The necessity for the new airport arises from the severe capacity limitations currently experienced at Lisbon’s Humberto Delgado Airport. As a primary gateway for tourism and business travel, the existing facility operates near its maximum potential during peak seasons.
Worth a look